The main control center will be divided into two perfectly symmetrical zones: the Peripheral Control Center and the Wastewater Treatment Plant Control Center. These will be separated by a large audiovisual totem that will segment the information from both control centers. Adjacent to the control center will be the data center for the entire industrial plant, from where all necessary communications and equipment will be managed.

More information or a quote